DVD-PAL
The fourth programme includes a Pacific 192 moving a 130ton transformer on the last leg of its journy from Birmingham to Uskmouth power station; the first ever 400,000 volt transformer, weighing 212 tons, on trailer 789, this load required three Pacifics; problems unloading a 460 ton transformer from a barge in Rotterdam, and much more – around 22 different operations in all.
- Running time approx 60 mins
- PAL DVD