DVD PAL
The structures bay is at the heart of this phase in the restoration. Amongst the many jobs to be completed are repairs to skins in the fuel tanks, jet pipes and air intakes, the removal of serious corrosion in the bomb aimer’s blister, and a key modification to the rear spar.
The Trust faced many financial difficulties and the project seemed to be on the brink of failure, when with only days left, exceptional media coverage brought in a staggering £1.2m in donations.
The programme ends with the dramatic and historic Roll Out, another important milestone in the story of the ulcan XH558.
- Running time 90 mins
- Plus additional 17 mins. bonus
- PAL DVD